黑蚂蚁(SemCms)外贸网站管理系统
TEL:0086-395-6665600
Home » 无料钟炉顶
Bell-Less Top Burden Loading Equipment
Categories
无料钟炉顶<br>Bell-Less Top Burden Loading Equipment
  • 无料钟炉顶<br>Bell-Less Top Burden Loading Equipment

无料钟炉顶
Bell-Less Top Burden Loading Equipment

Detailed description
Application: Used in BF top 
Usage: 1. Receiving hopper is used for receiving the burden that the charging equipment feeds.
2. Sealing hopper is used for preventing the BF gas from leaking during loading the burden into the furnace to maintain the stability of the furnace top pressure. 3. Snorting extensive system is used for balancing the pressure of the furnace top gas to ensure smooth burden loading into the furnace. 4. Charge distributor is used for re-distributing the burden according to the technical requirements to make the burden in the furnace distribute evenly and keep sound permeability. 
Components: Receiving hopper, sealing hopper, snorting extensive system, charge distributor, etc. 
BF Capacity: 300m³~2500m³